PROJECT SPECS:
LOCATION:
Burlington, CO
Year Completed:
2011
Size:
600-arces
Kit Carson Wind Farm: 51 MW (34) GE 1.5 MW Wind
Turbine Generators, 80 Meter Hub Height Towers
Services:
Boundary Surveys Construction Staking and Layout Platting Surveys Professional Surveying Services Surveying Topographical Survey and MappingClient:
Duke Energy
Architect:
NA
Other Partners:
Contractor: MasTec
Sambatek field staff provided a corridor survey, a boundary and topographic survey, a preliminary and final plat, and construction staking services for the Kit Carson Wind Farm in Burlington, Colorado.
Construction staking included horizontal and vertical control, staking for the laydown yard, turbine access road improvements, an O&M building site survey, layouts and location points for substation, collection system, row/tower easement, preparation of record plans, crop damage, turbines, MET Towers, and transmission lines.