PROJECT SPECS:
LOCATION:
Putnam, OK
Year Completed:
2012
Size:
54 Mitsubishi Turbines
129.6 Megawatts
20 Mile Transmission Line
Services:
Boundary Surveys Construction Staking and Layout Platting Surveys Surveying Topographical Survey and Mapping WindClient:
Edison Mission Energy
Architect:
NA
Other Partners:
Contractor: MasTec
Sambatek field staff provided a boundary and topographic survey, a corridor survey, a preliminary and final plat, and construction staking services for the Taloga Wind Farm in Putnam, Oklahoma.
Construction staking included horizontal and vertical control, staking for the laydown yard, turbine access road improvements, an O&M building site survey, layouts and location points for substation, collection system, row/tower easement, preparation of record plans, crop damage, turbines, MET Towers, and transmission lines.