PROJECT SPECS:

LOCATION:

Putnam, OK

Year Completed:

2012

Size:

54  Mitsubishi Turbines

129.6 Megawatts

20 Mile Transmission Line

Client:

Edison Mission Energy

Architect:

NA

Other Partners:

Contractor: MasTec

Sambatek field staff provided a boundary and topographic survey, a corridor survey, a preliminary and final plat, and construction staking services for the Taloga Wind Farm in Putnam, Oklahoma.

Construction staking included horizontal and vertical control, staking for the laydown yard, turbine access road improvements, an O&M building site survey, layouts and location points for substation, collection system, row/tower easement, preparation of record plans, crop damage, turbines, MET Towers, and transmission lines.