PROJECT SPECS:
LOCATION:
Wadena, MN
Year Completed:
2025
Size:
HWY 71 – 1.5 miles
HWY 29 – .9 miles
Client:
MnDOT District 3
Architect:
NA
Other Partners:
NA
Hwy 71
- Resurface from Franklin Ave. S to Aldrich Ave. S and update sidewalks and approaches, includes signal systems at the Hwy 71 intersections of Hwy 29/Colfax Ave. S and Bryant Ave. S
- Reconstruct from Birch Ave. N and Elm Ave. N, includes underground city utilities and storm sewers
- Resurface (mill and overlay) from Elm Ave. N to half-mile north of Alfred St. N and replace or repair underground structures, includes a continuous center left-turn lane through Alfred St. and a proposed city trail
Hwy 29
- Resurface (mill and overlay) from the Otter Tail/Wadena county line to Hwy 71/Jefferson St. S
- Update pedestrian sidewalk and ramps
Draft Layouts - February 2023
- Hwy 71 north of Hwy 10 (5 MB PDF)
- Hwy 71 south of Hwy 10 (3 MB PDF)
- Hwy 29 in Wadena (3 MB PDF)