PROJECT SPECS:

LOCATION:

Wadena, MN

Year Completed:

2025

Size:

HWY 71 – 1.5 miles

HWY 29 – .9 miles

Client:

MnDOT District 3

Architect:

NA

Other Partners:

NA

Hwy 71

  • Resurface from Franklin Ave. S to Aldrich Ave. S and update sidewalks and approaches, includes signal systems at the Hwy 71 intersections of Hwy 29/Colfax Ave. S and Bryant Ave. S
  • Reconstruct from Birch Ave. N and Elm Ave. N, includes underground city utilities and storm sewers
  • Resurface (mill and overlay) from Elm Ave. N to half-mile north of Alfred St. N and replace or repair underground structures, includes a continuous center left-turn lane through Alfred St. and a proposed city trail

Hwy 29

  • Resurface (mill and overlay) from the Otter Tail/Wadena county line to Hwy 71/Jefferson St. S
  • Update pedestrian sidewalk and ramps

Draft Layouts - February 2023