PROJECT SPECS:
LOCATION:
St. Paul, MN
Year Completed:
Ongoing
Size:
5.7 Miles
Services:
Civil Engineering Planning Public Engagement Surveying Transportation Planning Urban DesignClient:
MnDOT Metro District
Architect:
NA
Other Partners:
WSB Engineering, Rani Engineering
Sambatek is leading this scoping study and preliminary design of West 7th (TH 5) from downtown Saint Paul near the Mississippi River. Currently underway, the project team is engaging the public, developing full subsurface utility engineering base files, finalizing a traffic study, and developing alternatives to address project needs. This project will have extensive sidewalk impacts, requiring Sambatek and a sub-consultant to provide ADA-compliant sidewalk designs throughout the corridor – considering the needs of residents, businesses, transit agencies, and more.
Project Timeline
Community engagement: Summer 2022 through Fall 2028
Issue identification: Fall 2022 through 2023
Preliminary design: Winter 2023 through Winter 2024
Final design: Fall 2025 through 2026
Construction: 2027 and 2028